Triple

T29408333
Position Surface form Disambiguated ID Type / Status
Subject Entropy E745830 entity
Predicate instanceOf P0 FINISHED
Object binary package manager C7090 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: binary package manager
Context triple: [Entropy, instanceOf, binary package manager]
  • A. software package manager chosen
    A software package manager is a tool that automates the discovery, installation, updating, configuration, and removal of software packages and their dependencies in a consistent and reliable way.
  • B. software package repository
    A software package repository is a centralized storage and distribution system that hosts, organizes, and provides access to software packages and their metadata for installation, update, and dependency management.
  • C. system-in-package
    A system-in-package is an integrated circuit assembly that combines multiple functional components, such as processors, memory, and passive elements, into a single compact package to form a complete electronic subsystem.
  • D. JavaScript package manager
    A JavaScript package manager is a tool that automates the discovery, installation, updating, and dependency management of JavaScript libraries and frameworks for a project.
  • E. software build and distribution system
    A software build and distribution system automates compiling source code, packaging artifacts, and delivering them reliably to target environments or end users.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0a79eb7d081908c67197a5f347e68 completed April 28, 2026, 12:27 p.m.
Created at: April 28, 2026, 2:55 p.m.