Triple

T29389169
Position Surface form Disambiguated ID Type / Status
Subject PrintManager E745330 entity
Predicate instanceOf P0 FINISHED
Object Android framework API C5491 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Android framework API
Context triple: [PrintManager, instanceOf, Android framework API]
  • A. mobile software framework
    A mobile software framework is a reusable set of libraries, tools, and APIs that provides a structured foundation for building, deploying, and maintaining applications on mobile operating systems.
  • B. android
    An android is a human-like robot designed to mimic human appearance, behavior, and sometimes cognition, often used in science fiction and advanced robotics.
  • C. Android platform component
    An Android platform component is a fundamental building block of an Android application (such as an Activity, Service, BroadcastReceiver, or ContentProvider) that interacts with the system and other apps to provide specific functionality within the Android operating environment.
  • D. Android application
    An Android application is a software program designed to run on the Android operating system, providing specific functionality or services to users through a mobile or other Android-powered device.
  • E. API framework chosen
    An API framework is a structured set of tools, libraries, and conventions that simplifies designing, building, documenting, and managing application programming interfaces.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0a79dfabc81908755382ee47791e2 completed April 28, 2026, 12:27 p.m.
Created at: April 28, 2026, 2:41 p.m.