Triple
T29381610
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MTU Onsite Energy |
E745149
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | power generation systems brand |
C39953
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: power generation systems brand Context triple: [MTU Onsite Energy, instanceOf, power generation systems brand]
-
A.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
B.
wind power company
A wind power company is an organization that develops, owns, and operates wind energy projects to generate and sell electricity produced from wind turbines.
-
C.
power system
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
D.
gas turbine manufacturer
chosen
A gas turbine manufacturer is a company that designs, engineers, and produces gas turbine engines and related systems for applications such as power generation, aviation, and industrial processes.
-
E.
wind power plant
A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0a79cfd5481909b4dde750cb8d2c6 |
completed | April 28, 2026, 12:27 p.m. |
Created at: April 28, 2026, 2:35 p.m.