Triple

T29368910
Position Surface form Disambiguated ID Type / Status
Subject Odakyu Bus E744798 entity
Predicate operatesWithin P794 FINISHED
Object Odakyu railway corridor
The Odakyu railway corridor is a major commuter rail route in the Greater Tokyo area, running through key suburban and urban districts served by the Odakyu Electric Railway network.
E2102410 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Odakyu railway corridor | Statement: [Odakyu Bus, operatesWithin, Odakyu railway corridor]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Odakyu railway corridor
Triple: [Odakyu Bus, operatesWithin, Odakyu railway corridor]
Generated description
The Odakyu railway corridor is a major commuter rail route in the Greater Tokyo area, running through key suburban and urban districts served by the Odakyu Electric Railway network.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0a79ba954819094597628112c6091 completed April 28, 2026, 12:27 p.m.
NER Named-entity recognition batch_69f669a8aa708190b4bb1e8bc56b0dd7 completed May 2, 2026, 9:16 p.m.
NED1 Entity disambiguation (via context triple) batch_6a3735fefc008190b9daa5778747e858 completed June 21, 2026, 12:53 a.m.
NEDg Description generation batch_6a3736e618a08190bf12b3d753d12270 completed June 21, 2026, 12:57 a.m.
NED2 Entity disambiguation (via description) batch_6a3737749e6c81908f2f4eedb9ba704f completed June 21, 2026, 12:59 a.m.
Created at: April 28, 2026, 2:25 p.m.