Triple

T29263
Position Surface form Disambiguated ID Type / Status
Subject Bessemer process E584 entity
Predicate instanceOf P0 FINISHED
Object metallurgical process C682 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: metallurgical process
Context triple: [Bessemer process, instanceOf, metallurgical process]
  • A. nuclear reaction mechanism
    A nuclear reaction mechanism is the detailed sequence of interactions and intermediate steps by which incident particles induce changes in a nucleus, leading to specific reaction products and energy release.
  • B. engineering journal
    An engineering journal is a periodical publication that presents peer-reviewed research, technical developments, and practical applications in various fields of engineering.
  • C. manufacturing company
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • D. stripping reaction
    A stripping reaction is a type of nuclear reaction in which a projectile nucleus collides with a target nucleus and loses (or "strips off") one or more of its nucleons, which are then absorbed by the target.
  • E. mathematical method
    A mathematical method is a systematic procedure or algorithm used to solve problems, prove results, or analyze structures within mathematics.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2479dec388190967ba648663442c9 completed Feb. 28, 2026, 1:40 a.m.
Created at: Feb. 28, 2026, 1:44 a.m.