Triple
T29239709
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Unanswered Prayers (overall project Answered Prayers) |
E741286
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned book project |
C17115
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned book project Context triple: [Unanswered Prayers (overall project Answered Prayers), instanceOf, planned book project]
-
A.
unreleased book
chosen
An unreleased book is a completed or in-progress written work that has not yet been made publicly available through publication or distribution.
-
B.
bibliographic project
A bibliographic project is an organized effort to collect, describe, and manage references to published or unpublished works around a specific topic, author, or field.
-
C.
fictional plan
A fictional plan is an imagined, often detailed strategy or course of action that exists only within a narrative, scenario, or conceptual context rather than in real-world implementation.
-
D.
public works project
A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
-
E.
collaborative project
A collaborative project is a coordinated effort in which multiple individuals or groups work together, sharing responsibilities, resources, and expertise to achieve a common goal.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0911dd6fc819097d1abb287016489 |
completed | April 28, 2026, 10:51 a.m. |
Created at: April 28, 2026, 12:30 p.m.