Triple

T2921799
Position Surface form Disambiguated ID Type / Status
Subject BMT E78743 entity
Predicate instanceOf P0 FINISHED
Object Brooklyn–Manhattan Transit Corporation C221 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Brooklyn–Manhattan Transit Corporation
Context triple: [BMT, instanceOf, Brooklyn–Manhattan Transit Corporation]
  • A. division of Metropolitan Transportation Authority
    A division of the Metropolitan Transportation Authority is an organizational unit responsible for managing and operating a specific set of transit services, assets, or functions within the broader MTA system.
  • B. street railway company
    A street railway company is a business entity that owns, operates, and maintains streetcars or trams running on fixed rails along public streets to provide urban passenger transportation.
  • C. New York City Subway–railroad interchange
    A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
  • D. mass transit operator chosen
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • E. public transportation agency
    A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b0c2ad081909ff87050ae542bb9 completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 2:54 p.m.