Triple

T2920105
Position Surface form Disambiguated ID Type / Status
Subject DFS 194 E78698 entity
Predicate instanceOf P0 FINISHED
Object aircraft prototype C6075 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: aircraft prototype
Context triple: [DFS 194, instanceOf, aircraft prototype]
  • A. experimental aircraft chosen
    An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
  • B. experimental aircraft program series
    A coordinated sequence of research and development efforts focused on designing, building, testing, and evaluating prototype aircraft to explore new aerospace technologies, performance capabilities, and operational concepts.
  • C. turboprop aircraft
    A turboprop aircraft is a fixed-wing airplane powered by one or more gas-turbine engines that drive propellers to provide efficient thrust at low to medium flight speeds.
  • D. aircraft
    An aircraft is a powered or unpowered vehicle capable of sustained flight through the atmosphere, typically using wings or rotors to generate lift and control movement.
  • E. prototype rocket
    A prototype rocket is an experimental launch vehicle built to test and validate new propulsion, structural, and control technologies before full-scale production or operational deployment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b0c2ad081909ff87050ae542bb9 completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 2:54 p.m.