Triple
T29132831
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Machine de Marly |
E738424
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | historic hydraulic machine |
C21652
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: historic hydraulic machine Context triple: [Machine de Marly, instanceOf, historic hydraulic machine]
-
A.
era of hydraulic engineering
The era of hydraulic engineering is a historical period characterized by the systematic design, construction, and management of water control structures and systems to support human activities such as agriculture, urbanization, transportation, and energy production.
-
B.
historic irrigation canal
A historic irrigation canal is a man-made waterway constructed in the past to divert and distribute water for agricultural use, often reflecting the engineering practices and socio-economic conditions of its time.
-
C.
water-lifting device
chosen
A water-lifting device is a mechanism designed to raise water from a lower elevation to a higher one for purposes such as irrigation, supply, or drainage.
-
D.
historic water feature
A historic water feature is a man-made or modified natural water element, such as a fountain, canal, pond, or well, that holds cultural, architectural, or historical significance within a landscape or built environment.
-
E.
water-powered mill
A water-powered mill is a structure that uses the energy of flowing or falling water, typically via a waterwheel or turbine, to drive mechanical processes such as grinding grain, sawing wood, or generating power.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f07cb3adb48190a9e0e169cd026634 |
completed | April 28, 2026, 9:24 a.m. |
Created at: April 28, 2026, 11:32 a.m.