Triple

T29118
Position Surface form Disambiguated ID Type / Status
Subject Albufeira E580 entity
Predicate roadConnection P385 FINISHED
Object A22 motorway
The A22 motorway, also known as Via do Infante, is a major east–west toll highway in Portugal’s Algarve region that links coastal towns and connects to Spain.
E2219 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A22 motorway | Statement: [Albufeira, roadConnection, A22 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A22 motorway
Context triple: [Albufeira, roadConnection, A22 motorway]
  • A. Interstate 395
    Interstate 395 is a major auxiliary Interstate Highway in the eastern United States that connects Washington, D.C. with suburban Virginia and serves as a key commuter and regional traffic corridor.
  • B. U.S. Route 9
    U.S. Route 9 is a major north–south U.S. highway running along the East Coast, primarily through New York and New Jersey, connecting numerous cities and historic communities.
  • C. Interstate 66
    Interstate 66 is a major east–west U.S. highway in the Mid-Atlantic region that connects Washington, D.C. with northern Virginia and extends westward toward the Shenandoah Valley.
  • D. U.S. Route 1
    U.S. Route 1 is a major north–south United States highway running along the East Coast from Key West, Florida, to Fort Kent, Maine.
  • E. Bourne Bridge
    The Bourne Bridge is a major highway bridge in Massachusetts that carries traffic over the Cape Cod Canal, serving as one of the primary gateways between mainland Massachusetts and Cape Cod.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A22 motorway
Triple: [Albufeira, roadConnection, A22 motorway]
Generated description
The A22 motorway, also known as Via do Infante, is a major east–west toll highway in Portugal’s Algarve region that links coastal towns and connects to Spain.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: A22 motorway
Target entity description: The A22 motorway, also known as Via do Infante, is a major east–west toll highway in Portugal’s Algarve region that links coastal towns and connects to Spain.
  • A. Interstate 395
    Interstate 395 is a major auxiliary Interstate Highway in the eastern United States that connects Washington, D.C. with suburban Virginia and serves as a key commuter and regional traffic corridor.
  • B. U.S. Route 9
    U.S. Route 9 is a major north–south U.S. highway running along the East Coast, primarily through New York and New Jersey, connecting numerous cities and historic communities.
  • C. Interstate 66
    Interstate 66 is a major east–west U.S. highway in the Mid-Atlantic region that connects Washington, D.C. with northern Virginia and extends westward toward the Shenandoah Valley.
  • D. U.S. Route 1
    U.S. Route 1 is a major north–south United States highway running along the East Coast from Key West, Florida, to Fort Kent, Maine.
  • E. Bourne Bridge
    The Bourne Bridge is a major highway bridge in Massachusetts that carries traffic over the Cape Cod Canal, serving as one of the primary gateways between mainland Massachusetts and Cape Cod.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: roadConnection
Context triple: [Albufeira, roadConnection, A22 motorway]
  • A. roadFeature
    Indicates that an entity is a specific physical or functional characteristic associated with a road, such as its structure, markings, or related infrastructure.
  • B. roadType
    Indicates the classification or category of a road based on its functional or physical characteristics.
  • C. hasMajorHighway chosen
    Indicates that a location or area is served by or directly connected to a major highway route.
  • D. hasStreet
    Indicates that an entity is located on, associated with, or identified by a particular street.
  • E. routeNumber
    Indicates the specific identifying number assigned to a route within a transportation or delivery network.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2479dec388190967ba648663442c9 completed Feb. 28, 2026, 1:40 a.m.
NER Named-entity recognition batch_69a2490019948190a89bb0910c60d462 completed Feb. 28, 2026, 1:46 a.m.
NED1 Entity disambiguation (via context triple) batch_69a24e5d121c8190bf7bb88346dcc141 completed Feb. 28, 2026, 2:09 a.m.
NEDg Description generation batch_69a24edff52081909ec669158900651c completed Feb. 28, 2026, 2:11 a.m.
NED2 Entity disambiguation (via description) batch_69a24f4a96288190981be6076e919262 completed Feb. 28, 2026, 2:13 a.m.
PD Predicate disambiguation batch_69a2486d40348190b2d21fc444f499a6 completed Feb. 28, 2026, 1:44 a.m.
Created at: Feb. 28, 2026, 1:44 a.m.