Triple
T29110107
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Long March 3B |
E736877
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Long March rocket |
C3402
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Long March rocket Context triple: [Long March 3B, instanceOf, Long March rocket]
-
A.
Saturn V mobile launcher
The Saturn V mobile launcher was a massive, self-contained launch platform and service structure that transported, supported, and provided umbilical connections to the Saturn V rocket from assembly to liftoff.
-
B.
rocket-boosted missile
A rocket-boosted missile is a guided or unguided projectile that uses rocket propulsion to rapidly accelerate and deliver a warhead or payload to a distant target.
-
C.
heavy-lift launch vehicle
A heavy-lift launch vehicle is a powerful rocket system designed to carry large payloads—such as satellites, space station modules, or deep-space missions—into orbit or beyond.
-
D.
orbital launch vehicle
chosen
An orbital launch vehicle is a rocket-powered system designed to transport payloads from Earth's surface into orbit by achieving sufficient velocity and altitude to remain in continuous free-fall around the planet.
-
E.
super heavy-lift launch vehicle
A super heavy-lift launch vehicle is a powerful rocket system designed to carry extremely large payloads—such as crewed spacecraft, space station modules, or deep-space missions—into Earth orbit or beyond in a single launch.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f077ec765c81909474c88bcc8bab43 |
completed | April 28, 2026, 9:03 a.m. |
Created at: April 28, 2026, 11:18 a.m.