Triple
T29101552
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Power Base Converter |
E736650
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | backward compatibility adapter |
C6913
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: backward compatibility adapter Context triple: [Power Base Converter, instanceOf, backward compatibility adapter]
-
A.
backward compatibility configuration
A backward compatibility configuration defines the settings and rules that allow a system or component to continue functioning correctly with older versions, interfaces, or data formats.
-
B.
software compatibility layer
A software compatibility layer is an intermediary system component that enables applications designed for one operating environment, platform, or API to run correctly on another without requiring modification to the original software.
-
C.
adaptor
chosen
An adaptor is an object that converts the interface or data format of one component into another, enabling otherwise incompatible components to work together.
-
D.
modernizer
A modernizer is an agent—person, organization, or tool—that updates outdated systems, practices, or ideas to align with contemporary standards, technologies, and cultural expectations.
-
E.
abstraction layer
An abstraction layer is a conceptual class that hides the complexity of underlying systems or components by providing a simplified, uniform interface for higher-level operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f077ec765c81909474c88bcc8bab43 |
completed | April 28, 2026, 9:03 a.m. |
Created at: April 28, 2026, 11:12 a.m.