Triple

T29088722
Position Surface form Disambiguated ID Type / Status
Subject Guavio River basin E734194 entity
Predicate hasHydropowerFacility P15311 FINISHED
Object Guavio Hydroelectric Plant
The Guavio Hydroelectric Plant is a major hydroelectric power station in Colombia that harnesses the waters of the Guavio River to generate electricity for the national grid.
E1854380 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Guavio Hydroelectric Plant | Statement: [Guavio River basin, hasHydropowerFacility, Guavio Hydroelectric Plant]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Guavio Hydroelectric Plant
Triple: [Guavio River basin, hasHydropowerFacility, Guavio Hydroelectric Plant]
Generated description
The Guavio Hydroelectric Plant is a major hydroelectric power station in Colombia that harnesses the waters of the Guavio River to generate electricity for the national grid.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f05b0c0f28819086eae6e84f2ae472 completed April 28, 2026, 7 a.m.
NER Named-entity recognition batch_69f6617ba4a88190bfc5c305acb4f93f completed May 2, 2026, 8:41 p.m.
NED1 Entity disambiguation (via context triple) batch_6a25504bd4ec8190b0087063558d6eb0 completed June 7, 2026, 11:04 a.m.
NEDg Description generation batch_6a25549cc6548190937807666cda7b6f completed June 7, 2026, 11:23 a.m.
NED2 Entity disambiguation (via description) batch_6a255fff7c98819080aa4713ce278a9c completed June 7, 2026, 12:11 p.m.
Created at: April 28, 2026, 11:03 a.m.