Triple

T29052169
Position Surface form Disambiguated ID Type / Status
Subject DSTG Scottsdale E735287 entity
Predicate instanceOf P0 FINISHED
Object Defence Science and Technology Group facility C48086 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Defence Science and Technology Group facility
Context triple: [DSTG Scottsdale, instanceOf, Defence Science and Technology Group facility]
  • A. Ministry of Defence facility
    A Ministry of Defence facility is a secured government-controlled site used for the planning, coordination, support, and execution of national defence and military operations.
  • B. Royal Australian Navy shore establishment
    A Royal Australian Navy shore establishment is a land-based facility that supports naval operations through administration, training, logistics, maintenance, and other essential services.
  • C. weapons testing facility
    A weapons testing facility is a secure, controlled site where weapons and related systems are developed, evaluated, and tested for performance, safety, and reliability.
  • D. Australian Army barracks
    An Australian Army barracks is a military facility that provides accommodation, training areas, administrative offices, and support services for Australian Army personnel and units.
  • E. defence research laboratory chosen
    A defence research laboratory is a specialized facility dedicated to developing, testing, and evaluating technologies, systems, and methodologies to enhance national security and military capabilities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f077e64b88819094d37bdbca8191b3 completed April 28, 2026, 9:03 a.m.
Created at: April 28, 2026, 10:09 a.m.