Triple

T2904832
Position Surface form Disambiguated ID Type / Status
Subject Team Disney Anaheim building E62737 entity
Predicate instanceOf P0 FINISHED
Object corporate office building C240 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: corporate office building
Context triple: [Team Disney Anaheim building, instanceOf, corporate office building]
  • A. office building complex
    An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
  • B. public office
    A public office is an official position of authority and responsibility within a government or public institution, held to serve the interests and welfare of the public under established laws and regulations.
  • C. government building
    A government building is a structure owned or used by a public authority to house offices, services, and functions related to the administration and governance of a city, region, or country.
  • D. floor of a building
    A floor of a building is a horizontal structural level designed to support occupants and activities, typically bounded vertically by ceilings and/or other floors.
  • E. building chosen
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4c3e070c8190b78d3d2c005876dd completed March 6, 2026, 9:50 p.m.
Created at: March 6, 2026, 10:11 p.m.