Triple

T29018838
Position Surface form Disambiguated ID Type / Status
Subject Nord 260 E737391 entity
Predicate instanceOf P0 FINISHED
Object twin-turboprop regional airliner prototype C15296 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: twin-turboprop regional airliner prototype
Context triple: [Nord 260, instanceOf, twin-turboprop regional airliner prototype]
  • A. twin‑engine turboprop regional airliner chosen
    A twin-engine turboprop regional airliner is a short- to medium-range passenger aircraft powered by two propeller-driven turbine engines, optimized for efficient, reliable service on regional routes with relatively short runways.
  • B. turboprop aircraft
    A turboprop aircraft is a fixed-wing airplane powered by one or more gas-turbine engines that drive propellers to provide efficient thrust at low to medium flight speeds.
  • C. twin‑engine aircraft
    A twin-engine aircraft is an airplane equipped with two engines, typically mounted on the wings or fuselage, providing increased power, redundancy, and safety compared to single-engine designs.
  • D. twin-seat aircraft
    A twin-seat aircraft is an airplane designed with two seats, typically arranged in tandem or side-by-side, to accommodate a pilot and an additional occupant such as a co-pilot, instructor, or passenger.
  • E. twin-boom aircraft
    A twin-boom aircraft is an airplane whose tail assembly is supported by two longitudinal structures (booms) extending rearward from the wings or fuselage, typically joined at the tail by a horizontal stabilizer.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f077ee19f881909af48f9cab00a2e5 completed April 28, 2026, 9:03 a.m.
Created at: April 28, 2026, 9:47 a.m.