Triple
T29015478
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | barque shrine of Amun |
E737295
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | portable shrine |
C49618
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: portable shrine Context triple: [barque shrine of Amun, instanceOf, portable shrine]
-
A.
miniature shrine
chosen
A miniature shrine is a small, often portable sacred structure or display that houses religious icons, offerings, or symbols for personal devotion or ritual use.
-
B.
portable sanctuary
A portable sanctuary is a personal, movable space—physical or psychological—designed to provide comfort, safety, and retreat from external stressors wherever one goes.
-
C.
shrine board
A shrine board is an organized governing body responsible for managing, maintaining, and overseeing the operations, rituals, and development of a religious shrine or temple complex.
-
D.
sacred objects
Sacred objects are physical items imbued with spiritual, religious, or symbolic significance, believed to connect people with the divine, the transcendent, or deeply held cultural values.
-
E.
city pillar shrine
A city pillar shrine is a sacred structure, often centrally located in a town or city, that houses a symbolic pillar believed to protect and spiritually anchor the community.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f077ee19f881909af48f9cab00a2e5 |
completed | April 28, 2026, 9:03 a.m. |
Created at: April 28, 2026, 9:45 a.m.