Triple

T28989672
Position Surface form Disambiguated ID Type / Status
Subject New Bridge E734788 entity
Predicate instanceOf P0 FINISHED
Object section of bridge complex C1655 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: section of bridge complex
Context triple: [New Bridge, instanceOf, section of bridge complex]
  • A. bridge complex chosen
    A bridge complex is a molecular assembly that physically links two distinct cellular structures or regions, facilitating communication, transport, or mechanical coupling between them.
  • B. bridge–tunnel complex
    A bridge–tunnel complex is an integrated transportation structure that combines bridge spans and underwater tunnels to carry traffic across wide bodies of water or other large obstacles.
  • C. concrete bridge
    A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
  • D. concrete bridge
    A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable and stable pathway for transportation.
  • E. causeway-style bridge
    A causeway-style bridge is a low, often long roadway structure built across water, wetlands, or low-lying terrain, typically supported by embankments or short spans rather than tall piers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f05b0dd9b481908b7901e1c95ff6b2 completed April 28, 2026, 7 a.m.
Created at: April 28, 2026, 9:16 a.m.