Triple

T28980736
Position Surface form Disambiguated ID Type / Status
Subject Wudongde Dam E734540 entity
Predicate commissioningCompletionDate P56682 FINISHED
Object 2021 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2021 | Statement: [Wudongde Dam, commissioningCompletionDate, 2021]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: commissioningCompletionDate
Context triple: [Wudongde Dam, commissioningCompletionDate, 2021]
  • A. commissioningEndDate chosen
    Indicates the date on which the commissioning process or commissioning-related responsibilities are completed or terminated.
  • B. commissioningEndYear
    Indicates the calendar year in which the commissioning or initial operational phase of something is completed or ends.
  • C. substantialCompletionDate
    Indicates the date on which a project, work, or obligation is considered substantially complete, meaning the main required work has been finished to the point it can be used for its intended purpose.
  • D. assemblyCompletionDate
    Indicates the date on which the assembly process for an item or structure is finished.
  • E. originalCompletionDate
    Indicates the date on which something was first completed, before any subsequent changes, revisions, or updates.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f05b0dd9b481908b7901e1c95ff6b2 completed April 28, 2026, 7 a.m.
NER Named-entity recognition batch_69f6978fe97081908fe568091ad9b159 completed May 3, 2026, 12:32 a.m.
PD Predicate disambiguation batch_69f69661e6ec8190948251c7516a32ad completed May 3, 2026, 12:27 a.m.
Created at: April 28, 2026, 9:11 a.m.