Triple
T28916722
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sunan Giri grave complex |
E733386
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | grave complex |
C51282
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: grave complex Context triple: [Sunan Giri grave complex, instanceOf, grave complex]
-
A.
cemetery
A cemetery is a designated outdoor area where the dead are buried or interred, often marked by gravestones, monuments, and pathways for visitors to mourn and remember.
-
B.
monumental complex
A monumental complex is a large-scale, architecturally unified grouping of significant structures and spaces—such as temples, palaces, plazas, or memorials—designed to serve major ceremonial, political, religious, or commemorative functions.
-
C.
funerary site
chosen
A funerary site is a designated place where human or animal remains are buried, entombed, or otherwise ritually deposited, often accompanied by structures, markers, or artifacts related to death and commemoration.
-
D.
mausoleum
A mausoleum is a free-standing, often monumental building constructed as a tomb to house and honor the dead.
-
E.
burial monument
A burial monument is a constructed marker or structure, such as a tomb, gravestone, or mausoleum, that commemorates and identifies the resting place of the dead.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f05b0a5cc0819094828367ae204b70 |
completed | April 28, 2026, 7 a.m. |
Created at: April 28, 2026, 8:15 a.m.