Triple

T28907441
Position Surface form Disambiguated ID Type / Status
Subject Avenida Paseo Colón (segment) E733122 entity
Predicate instanceOf P0 FINISHED
Object avenue segment C1134 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: avenue segment
Context triple: [Avenida Paseo Colón (segment), instanceOf, avenue segment]
  • A. avenue
    An avenue is a broad, often tree-lined street or thoroughfare designed to accommodate significant vehicular and pedestrian traffic within an urban or suburban area.
  • B. road segment chosen
    A road segment is a continuous portion of a roadway between two defined endpoints, such as intersections or junctions, characterized by uniform attributes like direction, number of lanes, and speed limit.
  • C. highway segment
    A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
  • D. civic thoroughfare
    A civic thoroughfare is a major public street or corridor designed to accommodate high volumes of movement while structuring and showcasing key civic, cultural, and institutional functions of a community.
  • E. arterial roadway
    An arterial roadway is a high-capacity urban or suburban street designed to efficiently carry large volumes of through traffic between local streets and highways while providing limited direct property access.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f05b096d208190958a57d2e4b5a93a completed April 28, 2026, 7 a.m.
Created at: April 28, 2026, 8:08 a.m.