Triple

T28879906
Position Surface form Disambiguated ID Type / Status
Subject Shoreline Trail E732384 entity
Predicate instanceOf P0 FINISHED
Object cycling path C646 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cycling path
Context triple: [Shoreline Trail, instanceOf, cycling path]
  • A. rail trail chosen
    A rail trail is a multi-use path created from a disused railway corridor, typically used for walking, cycling, and other non-motorized recreation and transportation.
  • B. road bicycle
    A road bicycle is a lightweight, narrow-tired bicycle designed primarily for fast travel on paved roads, featuring drop handlebars and multiple gears for efficient long-distance riding.
  • C. long-distance cycle route
    A long-distance cycle route is a designated, often waymarked cycling corridor that spans substantial distances, connecting regions or countries and providing cyclists with a continuous, safe, and scenic path for multi-day journeys.
  • D. equestrian trail
    An equestrian trail is a designated path or route specifically designed and maintained for horseback riding, often featuring suitable terrain, signage, and accommodations for horses and riders.
  • E. cycling destination
    A cycling destination is a location or region specifically suited for bicycle travel, offering appealing routes, supportive infrastructure, and attractions that cater to cyclists’ interests and needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f05b06807c81909b4bbd4c20403a2b completed April 28, 2026, 7 a.m.
Created at: April 28, 2026, 7:42 a.m.