Triple

T28879083
Position Surface form Disambiguated ID Type / Status
Subject 伊良部大橋 E732362 entity
Predicate instanceOf P0 FINISHED
Object C43293 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 橋
Context triple: [伊良部大橋, instanceOf, 橋]
  • A. 교량
    교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
  • B. river bridge
    A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
  • C. bridge structure chosen
    A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
  • D. bridge in Taiwan
    A bridge in Taiwan is a structural construction that spans physical obstacles such as rivers, valleys, or roads within Taiwan’s territory to provide transportation routes for vehicles, pedestrians, or railways.
  • E. cross-sea bridge
    A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f05b06807c81909b4bbd4c20403a2b completed April 28, 2026, 7 a.m.
Created at: April 28, 2026, 7:41 a.m.