Triple

T28874111
Position Surface form Disambiguated ID Type / Status
Subject Balfour Beatty E732218 entity
Predicate instanceOf P0 FINISHED
Object infrastructure group C3206 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure group
Context triple: [Balfour Beatty, instanceOf, infrastructure group]
  • A. infrastructure management company
    An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
  • B. infrastructure chosen
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • C. infrastructure finance company
    An infrastructure finance company is a financial institution that provides long-term funding, credit support, and advisory services for the development, operation, and maintenance of large-scale public and private infrastructure projects.
  • D. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • E. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f05b06807c81909b4bbd4c20403a2b completed April 28, 2026, 7 a.m.
Created at: April 28, 2026, 7:36 a.m.