Triple
T28828541
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Odyssey (cancelled NT-based project) |
E727979
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cancelled operating system project |
C25946
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cancelled operating system project Context triple: [Odyssey (cancelled NT-based project), instanceOf, cancelled operating system project]
-
A.
unreleased operating system project
chosen
An unreleased operating system project is a not-yet-public software platform under development that manages hardware resources and provides core services for running applications.
-
B.
discontinued operating system
A discontinued operating system is a software platform for managing computer hardware and applications that is no longer developed, supported, or officially distributed by its creator.
-
C.
canceled operation
A canceled operation is an initiated process or action that has been intentionally stopped before completion, preventing any further execution or effect.
-
D.
cancelled product
A cancelled product is an item or service that was planned or in development but officially discontinued before or shortly after reaching the market.
-
E.
cancelled launch vehicle
A cancelled launch vehicle is a rocket or spacecraft design whose development or deployment was terminated before it could enter regular operational service.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0319dc6088190bbfaa206d40ed74a |
completed | April 28, 2026, 4:03 a.m. |
Created at: April 28, 2026, 6:36 a.m.