Triple

T28828541
Position Surface form Disambiguated ID Type / Status
Subject Odyssey (cancelled NT-based project) E727979 entity
Predicate instanceOf P0 FINISHED
Object cancelled operating system project C25946 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cancelled operating system project
Context triple: [Odyssey (cancelled NT-based project), instanceOf, cancelled operating system project]
  • A. unreleased operating system project chosen
    An unreleased operating system project is a not-yet-public software platform under development that manages hardware resources and provides core services for running applications.
  • B. discontinued operating system
    A discontinued operating system is a software platform for managing computer hardware and applications that is no longer developed, supported, or officially distributed by its creator.
  • C. canceled operation
    A canceled operation is an initiated process or action that has been intentionally stopped before completion, preventing any further execution or effect.
  • D. cancelled product
    A cancelled product is an item or service that was planned or in development but officially discontinued before or shortly after reaching the market.
  • E. cancelled launch vehicle
    A cancelled launch vehicle is a rocket or spacecraft design whose development or deployment was terminated before it could enter regular operational service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0319dc6088190bbfaa206d40ed74a completed April 28, 2026, 4:03 a.m.
Created at: April 28, 2026, 6:36 a.m.