Triple

T2882374
Position Surface form Disambiguated ID Type / Status
Subject Nankai Main Line E59425 entity
Predicate connectsTo P845 FINISHED
Object Nankai Koya Line E102999 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nankai Koya Line | Statement: [Nankai Main Line, connectsTo, Nankai Koya Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nankai Koya Line
Context triple: [Nankai Main Line, connectsTo, Nankai Koya Line]
  • A. Nankai Koya Line chosen
    The Nankai Koya Line is a major private railway line in the Osaka region of Japan operated by Nankai Electric Railway, connecting central Osaka with the Mount Koya area.
  • B. Namboku Line
    The Namboku Line is a Tokyo Metro subway line running north–south through central Tokyo, connecting residential districts with major business and transit hubs.
  • C. Karasuma Line
    The Karasuma Line is a major Kyoto Municipal Subway line running north–south through Kyoto, connecting key districts and transportation hubs including Kyoto Station.
  • D. Sennichimae Line
    The Sennichimae Line is a rapid transit line in Osaka, Japan, forming part of the city’s urban subway network.
  • E. Hankyu Senri Line
    The Hankyu Senri Line is a commuter railway line in the Osaka area of Japan operated by Hankyu Railway, serving suburban communities and connecting them to central Osaka.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4ac739188190a112f42a5a69c951 completed March 6, 2026, 9:44 p.m.
NER Named-entity recognition batch_69abe02aa5948190a2e0bd9168232bd5 completed March 7, 2026, 8:22 a.m.
NED1 Entity disambiguation (via context triple) batch_69bf06886d748190b346a1f4cc2b6f10 completed March 21, 2026, 8:58 p.m.
Created at: March 6, 2026, 10:03 p.m.