Triple

T28813333
Position Surface form Disambiguated ID Type / Status
Subject 北岳 E727573 entity
Predicate 登山適期 P1325 FINISHED
Object 主に7月から9月 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 主に7月から9月 | Statement: [北岳, 登山適期, 主に7月から9月]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: 登山適期
Context triple: [北岳, 登山適期, 主に7月から9月]
  • A. climbingSeason chosen
    Indicates the period during which climbing an object, route, or area is typically allowed, feasible, or considered optimal.
  • B. bestSeasonForTrekking
    Indicates that a particular season is the most suitable or optimal time for trekking in a given place or context.
  • C. bestHikingMonths
    Indicates the months of the year during which hiking conditions are considered most favorable for a given place or trail.
  • D. bestHikingMonthsNorthernHemisphere
    Indicates the months in the Northern Hemisphere that are considered most suitable or optimal for hiking.
  • E. recommendedTimeToHike
    Indicates the suggested or optimal time period during which one should undertake a particular hike.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0319c38948190bca746ad60fd25ba completed April 28, 2026, 4:03 a.m.
NER Named-entity recognition batch_69f658f163a88190b1dd222eaa0f93ea completed May 2, 2026, 8:05 p.m.
PD Predicate disambiguation batch_69f65760fd3081908ffe014a5e2bf069 completed May 2, 2026, 7:58 p.m.
Created at: April 28, 2026, 6:31 a.m.