Triple
T2874404
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hillview Reservoir |
E56841
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure of New York City |
C3206
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure of New York City Context triple: [Hillview Reservoir, instanceOf, infrastructure of New York City]
-
A.
New York City community board
A New York City community board is a local advisory group of appointed residents that consults on land use, budget, and service delivery issues within a specific community district.
-
B.
New York City Subway–railroad interchange
A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
-
C.
landmark in New York City
A landmark in New York City is a notable, often historically or culturally significant site, building, or structure officially recognized for its importance to the city’s heritage and identity.
-
D.
region of Manhattan
A region of Manhattan is a contiguous geographic area within the borough, defined by boundaries such as streets, avenues, or natural features, that shares common characteristics like land use, demographics, or cultural identity.
-
E.
infrastructure
chosen
Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4a4ced288190ab6d3e062d10f7f6 |
completed | March 6, 2026, 9:42 p.m. |
Created at: March 6, 2026, 10:03 p.m.