Triple

T2874404
Position Surface form Disambiguated ID Type / Status
Subject Hillview Reservoir E56841 entity
Predicate instanceOf P0 FINISHED
Object infrastructure of New York City C3206 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure of New York City
Context triple: [Hillview Reservoir, instanceOf, infrastructure of New York City]
  • A. New York City community board
    A New York City community board is a local advisory group of appointed residents that consults on land use, budget, and service delivery issues within a specific community district.
  • B. New York City Subway–railroad interchange
    A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
  • C. landmark in New York City
    A landmark in New York City is a notable, often historically or culturally significant site, building, or structure officially recognized for its importance to the city’s heritage and identity.
  • D. region of Manhattan
    A region of Manhattan is a contiguous geographic area within the borough, defined by boundaries such as streets, avenues, or natural features, that shares common characteristics like land use, demographics, or cultural identity.
  • E. infrastructure chosen
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a4ced288190ab6d3e062d10f7f6 completed March 6, 2026, 9:42 p.m.
Created at: March 6, 2026, 10:03 p.m.