Triple

T28739972
Position Surface form Disambiguated ID Type / Status
Subject Die Voraussetzungen des Sozialismus E730910 entity
Predicate instanceOf P0 FINISHED
Object work of revisionist Marxism C48831 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: work of revisionist Marxism
Context triple: [Die Voraussetzungen des Sozialismus, instanceOf, work of revisionist Marxism]
  • A. revisionist socialist
    A revisionist socialist is someone who seeks to reform and update traditional socialist theory and practice, often favoring gradual, democratic, and mixed-economy approaches over revolutionary or orthodox Marxist doctrines.
  • B. Marxist-inspired work chosen
    A Marxist-inspired work is a creative or scholarly piece that draws on Marxist theory to critique social, economic, and political structures, often focusing on class struggle, exploitation, and the dynamics of capitalism.
  • C. Marxist tradition
    The Marxist tradition is a broad, evolving body of thought and practice rooted in Karl Marx’s critique of capitalism, emphasizing class struggle, historical materialism, and the pursuit of a classless, communist society.
  • D. Marxist tendency
    A Marxist tendency is a distinct current within Marxist thought and practice that shares core Marxist principles but differs from others in its specific theoretical interpretations, strategic orientations, and organizational methods.
  • E. revolutionary theory
    Revolutionary theory is a conceptual framework that analyzes the conditions, processes, and strategies through which fundamental social, political, or economic transformations occur or can be brought about.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f043eae0908190b28ce314686247d7 completed April 28, 2026, 5:21 a.m.
Created at: April 28, 2026, 6:02 a.m.