Triple
T28697065
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gembloux Gap |
E729445
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | lowland corridor |
C21351
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: lowland corridor Context triple: [Gembloux Gap, instanceOf, lowland corridor]
-
A.
river corridor
A river corridor is the linear landscape surrounding a river, including its channel, banks, floodplain, and adjacent habitats, through which water, sediment, organisms, and energy flow and interact.
-
B.
Indigenous travel corridor
An Indigenous travel corridor is a traditional route or network of pathways used by Indigenous peoples for movement, trade, cultural exchange, and connection across their ancestral lands.
-
C.
land strip
chosen
A land strip is a long, narrow piece of land, often serving as a boundary, buffer, or connector between larger areas.
-
D.
stream corridor
A stream corridor is the linear landscape zone encompassing a stream and its adjacent floodplain, vegetation, and associated habitats that together influence the stream’s hydrology, ecology, and geomorphology.
-
E.
ecological corridor
An ecological corridor is a natural or restored habitat pathway that connects separate wildlife populations, enabling species movement, gene flow, and ecosystem resilience across fragmented landscapes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f043e6e9688190b6bdd6e5665498ff |
completed | April 28, 2026, 5:21 a.m. |
Created at: April 28, 2026, 5:40 a.m.