Triple
T28645662
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | west–east European inland waterway corridor |
E725047
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | trans-European transport network component |
C49884
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: trans-European transport network component Context triple: [west–east European inland waterway corridor, instanceOf, trans-European transport network component]
-
A.
trans-European transport network route
chosen
A trans-European transport network route is a designated corridor within the EU-wide integrated transport system that connects key cities, ports, and regions across Europe to facilitate efficient, interoperable, and sustainable cross-border movement of people and goods.
-
B.
trans-European road
A trans-European road is a major transportation route that crosses multiple European countries, facilitating international travel and trade across the continent.
-
C.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
D.
Polish expressway
A Polish expressway is a high-capacity, limited-access road in Poland designed for fast regional and intercity traffic, typically featuring dual carriageways, grade-separated junctions, and controlled entry and exit points.
-
E.
European transport agreement
A European transport agreement is a formal, often multilateral, accord between European states that harmonizes rules, standards, and procedures for cross-border transportation of goods and passengers to ensure safety, efficiency, and legal consistency.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f01d8423888190bd2f4e52605bf261 |
completed | April 28, 2026, 2:37 a.m. |
Created at: April 28, 2026, 4:47 a.m.