Triple
T2857147
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | IRT |
E63229
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | division of the New York City Subway |
C1888
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: division of the New York City Subway Context triple: [IRT, instanceOf, division of the New York City Subway]
-
A.
New York City Subway–railroad interchange
A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
-
B.
subway line
A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
-
C.
rapid transit division
chosen
A rapid transit division is an organizational unit within a transportation agency responsible for planning, operating, and maintaining high-frequency, high-capacity urban rail or bus rapid transit services.
-
D.
Long Island Rail Road service area
The Long Island Rail Road service area encompasses the network of commuter rail lines and stations extending from New York City through Nassau and Suffolk counties on Long Island, providing passenger rail service to communities across this region.
-
E.
New York City community board
A New York City community board is a local advisory group of appointed residents that consults on land use, budget, and service delivery issues within a specific community district.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4c41e8c08190a9e8f5249cc12610 |
completed | March 6, 2026, 9:50 p.m. |
Created at: March 6, 2026, 10:02 p.m.