Triple

T2853156
Position Surface form Disambiguated ID Type / Status
Subject Parramatta River E63137 entity
Predicate tributary P415 FINISHED
Object Lane Cove River E299993 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lane Cove River | Statement: [Parramatta River, tributary, Lane Cove River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lane Cove River
Context triple: [Parramatta River, tributary, Lane Cove River]
  • A. Lane Cove River chosen
    Lane Cove River is a tidal estuary and suburban waterway on Sydney’s Lower North Shore, flowing through bushland reserves before joining Sydney Harbour.
  • B. Nerang River
    The Nerang River is a major waterway in Queensland, Australia, flowing through the Gold Coast and supporting the region’s urban, recreational, and ecological environments.
  • C. Parramatta River
    The Parramatta River is a major waterway in Sydney, Australia, forming the western arm of Sydney Harbour and flowing through key suburban and commercial areas.
  • D. Merriwa River
    The Merriwa River is a tributary watercourse in New South Wales, Australia, that forms part of the larger Hunter River river system.
  • E. Westfield River
    The Westfield River is a major tributary of the Connecticut River in western Massachusetts, known for its scenic gorges, whitewater paddling, and protected wild and scenic segments.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4c407c408190857d25e027155ce9 completed March 6, 2026, 9:50 p.m.
NER Named-entity recognition batch_69abdf5e043c8190ac82112abce7262a completed March 7, 2026, 8:18 a.m.
NED1 Entity disambiguation (via context triple) batch_69b5281079fc8190a69ae43b14407736 completed March 14, 2026, 9:19 a.m.
Created at: March 6, 2026, 10:02 p.m.