Triple

T28480052
Position Surface form Disambiguated ID Type / Status
Subject Ley 2/1985 de Protección Civil E720667 entity
Predicate instanceOf P0 FINISHED
Object norma básica de protección civil C54110 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: norma básica de protección civil
Context triple: [Ley 2/1985 de Protección Civil, instanceOf, norma básica de protección civil]
  • A. BCP
    BCP is a Business Continuity Plan that outlines procedures and resources to ensure critical business functions continue or are quickly restored during and after a disruption.
  • B. U.S. national preparedness framework
    The U.S. national preparedness framework is a coordinated, all-hazards structure that defines roles, responsibilities, and core capabilities across government and society to prevent, protect against, mitigate, respond to, and recover from disasters and emergencies.
  • C. municipal protection category
    A municipal protection category is a classification used by local governments to designate and regulate areas, structures, or resources that require specific protective measures due to their environmental, cultural, historical, or public safety significance.
  • D. protective zone
    A protective zone is a designated area or boundary established to shield people, assets, or environments from potential harm, hazards, or unauthorized influence.
  • E. civil emergency service
    A civil emergency service is a public organization responsible for preparing for, responding to, and managing non-military crises and disasters to protect people, property, and the environment.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01a5983f48190b7c1b8857245a4f7 completed April 28, 2026, 2:24 a.m.
Created at: April 28, 2026, 2:54 a.m.