Triple

T2843588
Position Surface form Disambiguated ID Type / Status
Subject Mike O’Callaghan–Pat Tillman Memorial Bridge E62529 entity
Predicate instanceOf P0 FINISHED
Object concrete arch bridge C8519 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: concrete arch bridge
Context triple: [Mike O’Callaghan–Pat Tillman Memorial Bridge, instanceOf, concrete arch bridge]
  • A. concrete bridge
    A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
  • B. concrete bridge
    A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable and stable pathway for transportation.
  • C. steel arch bridge
    A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
  • D. stone arch bridge
    A stone arch bridge is a structure composed of curved stone arches that span a gap, using the compressive strength of masonry to support loads and provide passage over obstacles like rivers or valleys.
  • E. reinforced-concrete bridge chosen
    A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely carry and distribute loads across a span.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4c3d16bc81908b3a1c98fbd287fe completed March 6, 2026, 9:50 p.m.
Created at: March 6, 2026, 10:02 p.m.