Triple
T2841663
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mass Pike |
E62483
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | interstate highway segment |
C1129
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: interstate highway segment Context triple: [Mass Pike, instanceOf, interstate highway segment]
-
A.
highway segment
chosen
A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
-
B.
road segment
A road segment is a continuous portion of a roadway between two defined endpoints, such as intersections or junctions, characterized by uniform attributes like direction, number of lanes, and speed limit.
-
C.
Interstate Highway
An Interstate Highway is a high-capacity, limited-access roadway that forms part of a nationwide network designed to support efficient long-distance and high-speed vehicular travel between major cities and regions.
-
D.
highway
A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
-
E.
auxiliary Interstate Highway
An auxiliary Interstate Highway is a shorter, supplementary route connected to a primary Interstate that typically serves to bypass, loop around, or provide direct access to urban areas.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4c3d16bc81908b3a1c98fbd287fe |
completed | March 6, 2026, 9:50 p.m. |
Created at: March 6, 2026, 10:01 p.m.