Triple

T28408147
Position Surface form Disambiguated ID Type / Status
Subject BMT 60th Street Tunnel Connection E719593 entity
Predicate operator P179 FINISHED
Object Metropolitan Transportation Authority E3072 NE FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6f0f37c8190b37bc6fab08a9449 completed April 27, 2026, 11:53 p.m.
Created at: April 28, 2026, 1:25 a.m.