Triple
T28408145
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | BMT 60th Street Tunnel Connection |
E719593
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | subway track connection |
C11126
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: subway track connection Context triple: [BMT 60th Street Tunnel Connection, instanceOf, subway track connection]
-
A.
New York City Subway transfer connection
A New York City Subway transfer connection is a designated pathway or arrangement that allows passengers to move between different subway lines or stations within a single fare, facilitating efficient route changes and network connectivity.
-
B.
subway line
A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
-
C.
inter-borough connection
An inter-borough connection is a transportation or infrastructure link that enables movement and interaction between two or more boroughs within a metropolitan area.
-
D.
railroad junction
chosen
A railroad junction is a point where two or more railway tracks meet or diverge, allowing trains to switch routes.
-
E.
railway–metro interchange
A railway–metro interchange is a transport facility where mainline railway services and urban metro lines connect, enabling passengers to transfer conveniently between regional and local rail networks.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6f0f37c8190b37bc6fab08a9449 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 1:25 a.m.