Triple
T28406501
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hercules Graphics Card |
E719542
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | monochrome display adapter |
C44986
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: monochrome display adapter Context triple: [Hercules Graphics Card, instanceOf, monochrome display adapter]
-
A.
IBM PC display adapter
An IBM PC display adapter is a hardware expansion card that connects to the system bus to generate and output video signals to a monitor, defining the PC’s display capabilities such as resolution, color, and text/graphics modes.
-
B.
monochrome monitor
A monochrome monitor is a display device that shows images in a single color (and its shades) on a contrasting background, typically used for text-based or simple graphical output.
-
C.
aperture grille cathode-ray tube display technology
Aperture grille cathode-ray tube display technology uses vertical tensioned wires instead of a traditional shadow mask to allow more electron beam energy to reach the phosphors, producing brighter and sharper images with improved color accuracy.
-
D.
video display controller
chosen
A video display controller is a hardware component that generates and manages the video signal sent to a display device, handling tasks such as timing, resolution, and image rendering.
-
E.
CRT monitor
A CRT monitor is a bulky display device that uses a cathode ray tube to project electron beams onto a phosphorescent screen to produce images.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6f0f37c8190b37bc6fab08a9449 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 1:23 a.m.