Triple

T28396821
Position Surface form Disambiguated ID Type / Status
Subject Zoho Forms E719305 entity
Predicate instanceOf P0 FINISHED
Object data collection tool C48842 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: data collection tool
Context triple: [Zoho Forms, instanceOf, data collection tool]
  • A. data engineering tool
    A data engineering tool is a software solution that enables the collection, transformation, orchestration, and management of data pipelines to ensure reliable, scalable, and efficient data processing.
  • B. data acquisition platform chosen
    A data acquisition platform is a system that collects, aggregates, and manages data from diverse sources in real time for analysis, monitoring, and decision-making.
  • C. data quality tool
    A data quality tool is a software solution that profiles, validates, cleans, and monitors data to ensure its accuracy, consistency, completeness, and reliability across systems.
  • D. machine-readable data collection
    A machine-readable data collection is an organized set of data stored in a structured digital format that can be automatically processed and interpreted by computer systems without human intervention.
  • E. interactive data tool
    An interactive data tool is a software application that enables users to explore, manipulate, and visualize data dynamically through responsive, user-driven controls and interfaces.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6efd1b08190ae3cefd4f11388a2 completed April 27, 2026, 11:53 p.m.
Created at: April 28, 2026, 1:17 a.m.