Triple

T28393698
Position Surface form Disambiguated ID Type / Status
Subject UK Round 2 offshore wind projects E719222 entity
Predicate includes P1393 FINISHED
Object Westermost Rough offshore wind farm
Westermost Rough offshore wind farm is a large offshore wind power facility in the North Sea off the east coast of England, notable for being one of the first commercial projects to use Siemens 6 MW direct-drive turbines.
E1874170 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Westermost Rough offshore wind farm | Statement: [UK Round 2 offshore wind projects, includes, Westermost Rough offshore wind farm]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Westermost Rough offshore wind farm
Triple: [UK Round 2 offshore wind projects, includes, Westermost Rough offshore wind farm]
Generated description
Westermost Rough offshore wind farm is a large offshore wind power facility in the North Sea off the east coast of England, notable for being one of the first commercial projects to use Siemens 6 MW direct-drive turbines.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6efd1b08190ae3cefd4f11388a2 completed April 27, 2026, 11:53 p.m.
NER Named-entity recognition batch_69f64cee303081908e27fadd6ef248b1 completed May 2, 2026, 7:13 p.m.
NED1 Entity disambiguation (via context triple) batch_6a262d3c0c10819094e919ce5a2ee5e3 completed June 8, 2026, 2:47 a.m.
NEDg Description generation batch_6a26385590908190ad1f0e257d43db06 completed June 8, 2026, 3:34 a.m.
NED2 Entity disambiguation (via description) batch_6a2638b6f9648190b3c21891cdb2d554 completed June 8, 2026, 3:36 a.m.
Created at: April 28, 2026, 1:15 a.m.