Triple

T28389397
Position Surface form Disambiguated ID Type / Status
Subject 朝天门 E719108 entity
Predicate instanceOf P0 FINISHED
Object 交通枢纽 C82 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 交通枢纽
Context triple: [朝天门, instanceOf, 交通枢纽]
  • A. transport hub chosen
    A transport hub is a central location where multiple modes or routes of transportation intersect, enabling the efficient transfer of passengers or goods between them.
  • B. combined civic building and transportation hub
    A combined civic building and transportation hub is a multifunctional public facility that integrates government or community services with major transit infrastructure to centralize access, improve connectivity, and enhance urban efficiency.
  • C. transport terminal
    A transport terminal is a designated facility where passengers or goods begin, end, or transfer between different modes or routes of transportation.
  • D. intermodal passenger station
    An intermodal passenger station is a transportation facility where travelers can conveniently transfer between multiple modes of passenger transport, such as trains, buses, trams, and sometimes air or ferry services, within a coordinated hub.
  • E. ground transportation facility
    A ground transportation facility is a designated location that supports the movement, transfer, and management of passengers or goods via land-based modes such as buses, trains, cars, or trucks.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6ef211081909d31d9be5f5567e6 completed April 27, 2026, 11:53 p.m.
Created at: April 28, 2026, 1:12 a.m.