Triple
T283884
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Technical Cooperation Committee |
E5846
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | IMO body |
C281
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: IMO body Context triple: [Technical Cooperation Committee, instanceOf, IMO body]
-
A.
governing body
A governing body is an organized group of individuals with the authority and responsibility to make decisions, set policies, and oversee the direction and management of an institution, community, or state.
-
B.
advisory body
An advisory body is a group of appointed or elected individuals that provides expert guidance, recommendations, and informed opinions to decision-makers without having formal authority to implement decisions.
-
C.
meteorological organization
A meteorological organization is an entity responsible for observing, analyzing, and forecasting atmospheric conditions to support weather prediction, climate monitoring, and related public and scientific services.
-
D.
international organization
chosen
An international organization is an institutional entity formed by multiple countries or global actors to coordinate policies, manage shared interests, and address transnational issues through cooperative frameworks and agreements.
-
E.
body of water
A body of water is a naturally or artificially formed, relatively distinct accumulation of water—such as a lake, sea, river, or pond—occupying a definable area on the Earth's surface.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a25946a7ac8190a78871c210213272 |
completed | Feb. 28, 2026, 2:56 a.m. |
Created at: Feb. 28, 2026, 3:02 a.m.