Triple
T28379924
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MPI Discovery |
E718862
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | specialized construction ship |
C43271
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: specialized construction ship Context triple: [MPI Discovery, instanceOf, specialized construction ship]
-
A.
special-purpose vessel
chosen
A special-purpose vessel is a ship specifically designed and equipped to perform dedicated tasks or services that cannot be efficiently carried out by standard commercial or passenger vessels.
-
B.
cargo vessel
A cargo vessel is a large ship designed to transport goods and materials across bodies of water, often over long international routes.
-
C.
concrete ship
A concrete ship is a seafaring vessel whose hull is constructed from reinforced concrete instead of traditional materials like steel or wood.
-
D.
shipbuilder
A shipbuilder is a professional or company that designs, constructs, and repairs ships and other marine vessels, coordinating engineering, materials, and labor to ensure seaworthy and efficient watercraft.
-
E.
commissioned vessel
A commissioned vessel is a ship or boat that has been formally placed into active service by an authorized organization, typically a navy or government agency, under an official commission.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6ee5afc8190bd7375a29f0cc6c6 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 1:05 a.m.