Triple
T28374000
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 武当山旅游集散中心 |
E718706
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 旅游服务枢纽 |
C10870
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 旅游服务枢纽 Context triple: [武当山旅游集散中心, instanceOf, 旅游服务枢纽]
-
A.
travel service category
A travel service category classifies and groups related travel offerings—such as transportation, accommodation, tours, or travel insurance—into distinct types to organize and manage travel products and services.
-
B.
tourist facility
chosen
A tourist facility is a place or establishment that provides services, amenities, or attractions specifically designed to accommodate and enhance the experience of visitors and travelers.
-
C.
integrated transportation and hospitality system
An integrated transportation and hospitality system is a coordinated network that seamlessly combines travel services (such as flights, trains, and local transit) with lodging, amenities, and guest services into a unified, end-to-end customer experience.
-
D.
transport hub
A transport hub is a central location where multiple modes or routes of transportation intersect, enabling the efficient transfer of passengers or goods between them.
-
E.
tourist infrastructure
Tourist infrastructure comprises the physical and organizational facilities, services, and systems (such as transportation, accommodations, attractions, and information centers) that support and enable tourism activities in a destination.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6ee5afc8190bd7375a29f0cc6c6 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 1:01 a.m.