Triple
T2836552
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Grip car 8 |
E62365
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | San Francisco cable car |
C1080
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: San Francisco cable car Context triple: [Grip car 8, instanceOf, San Francisco cable car]
-
A.
cable car pioneer
A cable car pioneer is an innovator who develops, implements, or significantly advances early cable-driven transportation systems for people or goods.
-
B.
hill in San Francisco
A hill in San Francisco is a steeply elevated landform within the city that shapes its distinctive topography, influencing street gradients, views, architecture, and neighborhood character.
-
C.
streetcar system
A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
-
D.
cable car system
chosen
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
-
E.
AeroTrain station
An AeroTrain station is a designated facility where passengers board, disembark, and transfer between AeroTrains, providing platforms, ticketing, waiting areas, and related services for high-speed or automated airport rail transit.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4c3c39188190955b9c49d98463d8 |
completed | March 6, 2026, 9:50 p.m. |
Created at: March 6, 2026, 10:01 p.m.