Triple
T28354053
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Eddystone (Remington-UMC) (contract) |
E718176
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | U.S. government arsenal |
C6275
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: U.S. government arsenal Context triple: [Eddystone (Remington-UMC) (contract), instanceOf, U.S. government arsenal]
-
A.
U.S. military ordnance
U.S. military ordnance encompasses the weapons, ammunition, explosives, and related equipment developed, procured, and used by the United States armed forces for combat and defense operations.
-
B.
United States federal property
chosen
United States federal property is any land, building, structure, or asset owned, leased, or otherwise controlled by the federal government of the United States for public, governmental, or military purposes.
-
C.
military establishment
A military establishment is an organized institution or network of institutions responsible for a nation's armed forces, defense policies, and related political, economic, and social interests.
-
D.
weapons testing facility
A weapons testing facility is a secure, controlled site where weapons and related systems are developed, evaluated, and tested for performance, safety, and reliability.
-
E.
naval arsenal
A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6ec27b481908c8d7b86c47893d9 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 12:48 a.m.