Triple
T28354029
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Remington Arms (contract) |
E718175
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | World War I–era contract |
C53928
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: World War I–era contract Context triple: [Remington Arms (contract), instanceOf, World War I–era contract]
-
A.
World War I era case
A World War I era case is a protective container or enclosure designed and used during the First World War to store, transport, or safeguard military equipment, documents, or personal belongings under wartime conditions.
-
B.
World War I-era declaration
A World War I-era declaration is a formal, often government-issued statement that announces intentions, positions, or demands related to the political, military, or diplomatic circumstances of the First World War.
-
C.
World War I–era diplomatic agreement
A World War I–era diplomatic agreement is a formal treaty, pact, or understanding negotiated between states during or immediately surrounding the First World War, aimed at managing alliances, territorial claims, military commitments, or postwar settlements.
-
D.
World War I–era plot
A World War I–era plot is a narrative centered around events, characters, and conflicts shaped by the political, social, and military conditions of the First World War period.
-
E.
World War I–era legislation
World War I–era legislation encompasses the laws and acts enacted by governments during and immediately surrounding World War I to mobilize resources, regulate economies, control dissent, and manage wartime and postwar social, political, and military conditions.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6ec27b481908c8d7b86c47893d9 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 12:48 a.m.