Triple
T283540
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Global Data-processing and Forecasting System |
E5839
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | data-processing and forecasting system |
C224
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: data-processing and forecasting system Context triple: [Global Data-processing and Forecasting System, instanceOf, data-processing and forecasting system]
-
A.
information system
chosen
An information system is an organized combination of people, processes, data, and technology designed to collect, process, store, and distribute information to support decision-making and control in an organization.
-
B.
computing device
A computing device is an electronic system that processes input data using programmable instructions to produce, store, or transmit information.
-
C.
socio-technical system
A socio-technical system is an interconnected arrangement of people, technologies, and organizational structures whose interactions jointly shape how work is performed and outcomes are produced.
-
D.
distributed system
A distributed system is a collection of independent computers that appear to users as a single coherent system by coordinating and communicating over a network to achieve common goals.
-
E.
time-sharing company
A time-sharing company is a business that sells shared ownership or usage rights to a property or resource, allowing multiple clients to use it for specified time periods.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a25946a7ac8190a78871c210213272 |
completed | Feb. 28, 2026, 2:56 a.m. |
Created at: Feb. 28, 2026, 3:02 a.m.