Triple
T28315845
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nineteen Eighty-Four (1954 BBC adaptation) |
E717133
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | BBC television production |
C28129
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: BBC television production Context triple: [Nineteen Eighty-Four (1954 BBC adaptation), instanceOf, BBC television production]
-
A.
BBC television show
A BBC television show is a broadcast or streamed program produced or commissioned by the British Broadcasting Corporation, typically reflecting its public-service remit through informative, educational, or entertaining content.
-
B.
BBC television drama series
A BBC television drama series is a scripted, episodic program produced or commissioned by the British Broadcasting Corporation that focuses on character-driven storytelling and dramatic narratives for broadcast or streaming.
-
C.
British television film
chosen
A British television film is a feature-length dramatic or documentary production made primarily for initial broadcast on British television rather than theatrical release.
-
D.
television production centre
A television production centre is a facility equipped with studios, control rooms, and technical infrastructure where television programs are planned, recorded, edited, and broadcast.
-
E.
television production company
A television production company is an organization that develops, finances, and produces television content such as series, specials, and documentaries for broadcast, cable, or streaming platforms.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6e6c3b08190ad78de6ba7f04548 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 12:20 a.m.